In the works now on a Z is a total top end rebuild with the removal of the secondaries and charcoal system, LOTS of clean up, TB coolant bypass, new computer tune (thanks Pete), change all the gaskets (Thanks Jerry), new stainless injectors, and powdercoat the top end. Then Coilovers, sway bars, poly bushings, and R & D frame brace for the front.
As far as my own projects the L98 car has so far gotten a new to me 3 inch SS B&B exhaust and will hopefully be installing a Harlan mini shift light and ZR51 short shifter soon. I need to change a few other little things but that should be it on that one. On the Z I hope to get the coilovers back on the car and add a Harlan mini light and ZR51 shifter as well for that car. I need to finish mocking up the new 3 inch exhaust and get everything ordered. I think that is it but who knows LOL Oh yea and SELL THE 96 GRAND SPORT!!!
Quote:
Big Big winter project coming
|

Lee, You can't leave us hanging!!!!! and how is the B2K coming?
Quote:
I have so much going on that I don't know where to begin.
EX5023 - interior and final tuning
91-95 Rear bumper moldings at the mold maker
Widening my Callaway Kit
53-55 Tailshaft housing at the foundry for repro's
Three frame-off restorations going on as well.
|
Brett,
I'm looking forward to seeing EX5023 come together that is such a cool project.
Daniel