Quote:
Originally Posted by billschroeder5842
Thanks for the direction. I tackled the drivers side this afternoon (there is no l could leave one side "not done" as there is no way I could not be symmetrical.
Straight forward with nothing goofy. I did take your advice and clean up connections and grounds while I was in there messing around.
I probably could have done it in 90 minutes but it took longer with all the cleaning, wiping, vacuuming, wire brushing, taping etc.
|
Excellent........and yes on that junction block.....me also
and yes on being symmetrical .......me also.....had to take a wheel back to Discount Tire the other day to get remounted......turns out I had two left Sawblade Rims for new Nitto 555s. Just bugged me one side did not look like a saw blade